Wednesday, December 4, 2019

Another visit to Bayfield Mews - the Countdown is ON!

Nope, no driveway pour done yet. However we have been assured we will be able to move in next Wed, Dec 11. The moving truck can get beside the back patio and move in from there. This is likely a better option than parking in front, even if the driveway was in. Other than that we can live without a driveway for now, but it shouldn't have to be for long.

It's official, we have a house number!
 
The fireplace surround is almost finished

 
Bathroom taps and backsplash are installed


Kitchen is pretty much ready for appliances. This is the stove slot.

The in-floor heat was turned on yesterday, and it was 75F inside today. Warmer than we will want, but good to know it's working. 

15 comments:

  1. It looks lovely - a week and you should be unpacking. How exciting it will be to see your stuff again after so long.

    ReplyDelete
    Replies
    1. It's hard to imagine that this journey will soon be done. It sure is exciting for us.

      Delete
  2. Glad you're going to be able to move in on time! We'll be counting down with you.

    ReplyDelete
  3. Wow! Everything is looking great. I love your colour choices.

    ReplyDelete
  4. Looking like a home!
    So excited for you both!
    ♡♥

    ReplyDelete
  5. Your place is beautiful and really coming together. I would love to cook in that kitchen!!

    ReplyDelete
    Replies
    1. You're welcome to drop in and cook for us sometime. :)))

      Delete